HMAS TOBRUK – 1

Date:  15th July 2011

Job:  Rubber seal in Bow Doors.

Challenge:  Design a full Scaffold starting initially in the dry dock and been able to once shift floated scaffold should rise with it. Due to Thales work exponentially.

Description:  Scaffold originally designed to float with the ship enabling work repair to be carried out on the bow door hydraulic system.

For free on-site estimation proposal, call us 02 9896 2527 or