HMAS TOBRUK – 2

Date:  23rd April 2010

Job:  Called by Thales to provide access to Bow Doors to crop and renew Bow Doors.

Challenge:  To provide scaffold access from forecastle to the water line to enable work to continue while HMAS Tobruk afloat.

Description:  Originally built from the dock floor and designed in a such a way that lower part of the Scaffold could be removed with 90% of scaffolding be suspended from the forecastle.